26,620 tonnes of coal for Rampal power plant reaches Mongla

    Originally published in The Daily Star on 10 June 2023

    A Chinese-flagged ship carrying 26,620 tonnes of coal for Rampal Thermal Power Plant in Bagerhat has arrived at Mongla port.

    The coal-carrying ship reached Harbaria of the port at 5:00 am today, said Khandaker Reazul Haque, assistant manager of Togi Shipping and Logistics Limited Khulna, the local shipping agent of the ship MV J Hai.

    At present, the unloading and transporting activities are going on.

    The ship left Indonesia for Mongla port on May 21.